Commercial Battery Backup and Runtime
A battery system designed for backup can keep selected equipment running, such as refrigeration, registers, or network equipment. Tell the contractor what needs to stay on and for how long. They can estimate runtime from the equipment’s power draw and the battery’s usable capacity, and confirm whether your solar panels can recharge it while the grid is down.
Battery Storage for Demand Charges
If your electric rate charges for peak demand, a battery can supply part of your power during those peaks so the building draws less from the grid. Share a year of utility bills and interval usage data if you have it. Ask the contractor to compare your estimated demand charges with and without storage using the rate on your bill.


Design the system and plan approvals. The solar team lays out the array and works through the structural and electrical requirements. Confirm who handles permits, inspections and the application to connect to the grid.
Schedule construction around your operations. Agree on where crews and equipment will go, which access routes need to stay open and when any electrical shutdown can happen.
Install, test and start up. The contractor installs the equipment and tests the system. Confirm who secures the utility’s permission to operate when required.
Set up monitoring. Get access to the production dashboard, the final drawings, test results and warranty contacts. Decide who on your team will receive alerts.